|
System Design, Heat load Calculation, Equipment Selections, Drawing
INSTALLATION
AHU Installation, FCU Installation, Air washer Installation, Boiler Installation
Ventilation unit installation, Ductable Split Installation.Cassette unit Installation
Packaged Unit Installation, Roof Top Unit Installation, Hi Wall Installation
PIPING
MS piping, GI piping, Copper piping, Drain pipe, Electrical conduit
DUCTING:
GI duct in
18 gauges, 20 gauges, 22 gauges, 24 gauges
INSULLATION
Thermal Insulations
Cross Linked Polyethylene, Closed cell Nitrile, Polyethylene Foam (PUF)
Expanded Polystyrene (Thermo coal)
Acoustic Insulation
Glass Wool, under deck Insulation, Expanded Polystyrene (Thermo coal),
Nitrile.
MAINTENACE
Preventive, Break down, Operation & Maintenance
Comprehensive
Non-Comprehensive
|
|